{"product_id":"precedence-and-arrow-networking-techniques-for-construction-paperback-softback-9780471041238","title":"Precedence and Arrow Networking Techniques for Construction (Paperback \/ softback) 9780471041238","description":"\u003cfont face=\"Georgia\"\u003e\r\n\u003cp\u003e\u003cfont size=\"6\"\u003ePrecedence and Arrow Networking Techniques for Construction\u003c\/font\u003e\u003cbr\u003e\r\n\r\n\r\n\r\n\r\n\r\n\u003c\/p\u003e\n\u003cp\u003e\u003cfont size=\"4\"\u003eRobert B. Harris (Author)\u003c\/font\u003e\u003c\/p\u003e\r\n\r\n\u003cp\u003e\u003cfont size=\"3\"\u003e9780471041238, Wiley\u003c\/font\u003e\u003c\/p\u003e\r\n\r\n\u003cp\u003e\u003cfont size=\"3\"\u003ePaperback \/ softback, published 1 November 1978\u003c\/font\u003e\u003c\/p\u003e\r\n\r\n\u003cp\u003e\u003cfont size=\"3\"\u003e448 pages\u003cbr\u003e23.4 x 16.1 x 2.7 cm, 0.638 kg\u003c\/font\u003e\u003c\/p\u003e\r\n\r\n\r\n\r\n\r\n\r\n\u003cp align=\"justify\"\u003e\u003cstrong\u003e\u003cfont size=\"3\"\u003eTwo important scheduling techniques for modern construction management--the precedence technique and the arrow technique--are developed and analyzed. The parallel treatment of these two applications presents a basis of theory and practice for the civil engineering student and the practicing project manager. Introduces the concept of the scheduling plan as a design process. Shows the steps for developing the list of activities as the basis for any networking technique. Gives computations for arrow and precedence diagrams. Covers practical techniques for making time-cost adjustments to early start schedules. Concludes with discussion of applications of techniques in the context of real-life projects.\u003c\/font\u003e\u003c\/strong\u003e\u003c\/p\u003e\r\n\r\n\u003cp\u003e\u003cfont size=\"3\"\u003eIntroduction.\u003cbr\u003e \u003cbr\u003e Project Breakdown.\u003cbr\u003e \u003cbr\u003e Basic Arrow Diagraming.\u003cbr\u003e \u003cbr\u003e Basic Precedence Diagraming.\u003cbr\u003e \u003cbr\u003e Establishing Activity Durations.\u003cbr\u003e \u003cbr\u003e Scheduling Computations for Arrow Networks.\u003cbr\u003e \u003cbr\u003e Scheduling Computations for Precedence Networks.\u003cbr\u003e \u003cbr\u003e Communicating the Schedule.\u003cbr\u003e \u003cbr\u003e Project Control.\u003cbr\u003e \u003cbr\u003e Time-Cost Adjustments.\u003cbr\u003e \u003cbr\u003e Resource Leveling.\u003cbr\u003e \u003cbr\u003e Program Evaluation and Review Technique (PERT).\u003cbr\u003e \u003cbr\u003e Overlapping Networks.\u003cbr\u003e \u003cbr\u003e Index.\u003c\/font\u003e\u003c\/p\u003e\r\n\r\n\u003cp\u003e\u003cfont size=\"3\"\u003eSubject Areas: Civil engineering, surveying \u0026amp; building [\u003ca title=\"See our other books on Civil engineering, surveying \u0026amp; building\" href=\"https:\/\/freshlyprintedbooks.co.uk\/search?q=%22Civil%20engineering,%20surveying%20\u0026amp;%20building%20%5BTN%5D%22\"\u003eTN\u003c\/a\u003e]\u003c\/font\u003e\u003c\/p\u003e\r\n\r\n\r\n\u003c\/font\u003e","brand":"Wiley","offers":[{"title":"Brand New","offer_id":52278195126552,"sku":"9780471041238","price":217.39,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0730\/2037\/5320\/files\/9780471041238.jpg?v=1781459359","url":"https:\/\/freshlyprintedbooks.co.uk\/products\/precedence-and-arrow-networking-techniques-for-construction-paperback-softback-9780471041238","provider":"Freshly Printed Books","version":"1.0","type":"link"}