{"product_id":"guidelines-for-performing-effective-pre-startup-safety-reviews-hardback-9780470134030","title":"Guidelines for Performing Effective Pre-Startup Safety Reviews (Hardback) 9780470134030","description":"\u003cfont face=\"Georgia\"\u003e\r\n\u003cp\u003e\u003cfont size=\"6\"\u003eGuidelines for Performing Effective Pre-Startup Safety Reviews\u003c\/font\u003e\u003cbr\u003e\r\n\r\n\r\n\r\n\r\n\r\n\u003c\/p\u003e\n\u003cp\u003e\u003cfont size=\"4\"\u003eCCPS (Author)\u003c\/font\u003e\u003c\/p\u003e\r\n\r\n\u003cp\u003e\u003cfont size=\"3\"\u003e9780470134030, Wiley\u003c\/font\u003e\u003c\/p\u003e\r\n\r\n\u003cp\u003e\u003cfont size=\"3\"\u003eHardback, published 26 April 2007\u003c\/font\u003e\u003c\/p\u003e\r\n\r\n\u003cp\u003e\u003cfont size=\"3\"\u003e192 pages\u003cbr\u003e24.1 x 16 x 1.6 cm, 0.485 kg\u003c\/font\u003e\u003c\/p\u003e\r\n\r\n\r\n\r\n\r\n\r\n\u003cp align=\"justify\"\u003e\u003cstrong\u003e\u003cfont size=\"3\"\u003eThis book provides guidance to those with responsibility for scheduling and executing a Pre-Startup Safety Review (PSSR). It outlines a protocol and tool for use by project or turnaround teams, to effectively and efficiently schedule and execute a PSSR.  \u003cul\u003e \u003cli\u003eIntegrates PSSR throughout the project\/turnaround phases, with a verification check at the traditional PSSR step\u003c\/li\u003e \u003cli\u003eSupports a \"right first time\" and \"check only once\" project philosophy to eliminate surprises\u003c\/li\u003e \u003cli\u003eFeatures how-to checklists, hazard assessment, batch and continuous processes, validation, and documentation\u003c\/li\u003e \u003cli\u003eIncludes a CD with PSSR checklists and PSSR management system examples.\u003c\/li\u003e \u003c\/ul\u003e \u003cp\u003e\u003cb\u003eNote:\u003c\/b\u003e CD-ROM\/DVD and other supplementary materials are not included as part of eBook file.\u003c\/p\u003e\u003c\/font\u003e\u003c\/strong\u003e\u003c\/p\u003e\r\n\r\n\u003cp\u003e\u003cfont size=\"3\"\u003eList of Tables.  \u003cp\u003eList of Figures.\u003c\/p\u003e \u003cp\u003eItems on the CD Accompanying This Book.\u003c\/p\u003e \u003cp\u003eAcronyms and abbreviations.\u003c\/p\u003e \u003cp\u003eGlossary.\u003c\/p\u003e \u003cp\u003eAcknowledgements.\u003c\/p\u003e \u003cp\u003ePreface.\u003c\/p\u003e \u003cp\u003e\u003cb\u003e1. Introduction.\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003e1.1 What are the Benefits of Performing Pre-startup Safety Reviews?\u003c\/p\u003e \u003cp\u003e1.2 How PSSR Relates to Other Process Safety Elements.\u003c\/p\u003e \u003cp\u003e1.3 An Overview of the Risk-based Approach to PSSR.\u003c\/p\u003e \u003cp\u003e1.4 What is the Scope of a PSSR? Process Safety, Environmental, Quality and Personnel Safety Considerations.\u003c\/p\u003e \u003cp\u003e1.5 This Guideline’s Audience.\u003c\/p\u003e \u003cp\u003e1.6 How to use this Guideline.\u003c\/p\u003e \u003cp\u003e1.7 References.\u003c\/p\u003e \u003cp\u003e\u003cb\u003e2. What Is a Pre-Startup Safety Review?\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003e2.1 The Basics of Pre-startup Safety Review.\u003c\/p\u003e \u003cp\u003e2.1.1 Some Common Steps for Performing PSSR.\u003c\/p\u003e \u003cp\u003e2.2 What is a Risk-based Approach to PSSR?\u003c\/p\u003e \u003cp\u003e2.3 The Role of Training in Pre-startup Safety Review.\u003c\/p\u003e \u003cp\u003e2.3.1 Training Team Leaders and Members.\u003c\/p\u003e \u003cp\u003e2.3.2 Training Managers and the Remaining Workforce.\u003c\/p\u003e \u003cp\u003e2.4 Scheduling Considerations.\u003c\/p\u003e \u003cp\u003e2.4.1 Capital Projects.\u003c\/p\u003e \u003cp\u003e2.4.2 Changes to Operating Facilities.\u003c\/p\u003e \u003cp\u003e2.4.3 Temporary Changes.\u003c\/p\u003e \u003cp\u003e2.4.4 Restarting a Mothballed Process.\u003c\/p\u003e \u003cp\u003e2.4.5 Post-turnaround Startup.\u003c\/p\u003e \u003cp\u003e2.4.6 Routine Maintenance.\u003c\/p\u003e \u003cp\u003e2.4.7 Startup After Emergency Shutdown.\u003c\/p\u003e \u003cp\u003e2.5 References.\u003c\/p\u003e \u003cp\u003e\u003cb\u003e3. Regulatory Issues.\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003e3.1 An Overview of PSSR Industry Guidelines and Regulations.\u003c\/p\u003e \u003cp\u003e3.2 Best Practices for PSSR.\u003c\/p\u003e \u003cp\u003e3.3 Environmental Considerations.\u003c\/p\u003e \u003cp\u003e3.4 General Safety, Security, and Occupational Health Considerations.\u003c\/p\u003e \u003cp\u003e3.5 References.\u003c\/p\u003e \u003cp\u003e\u003cb\u003e4. A Risk-Based Approach to Pre-Startup Safety Review.\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003e4.1 Using Risk Analysis Techniques to Select the Level of Detail for a PSSR.\u003c\/p\u003e \u003cp\u003e4.1.1 A Case of Complexity Versus Simplicity.\u003c\/p\u003e \u003cp\u003e4.1.2 The Term Complexity Includes Novelty.\u003c\/p\u003e \u003cp\u003e4.1.3 The Effect of Complexity on PSSR Team Size and Expertise.\u003c\/p\u003e \u003cp\u003e4.1.4 The Effect on the Level and Scope of the Review.\u003c\/p\u003e \u003cp\u003e4.2 A Decision Guideline for Designing a PSSR.\u003c\/p\u003e \u003cp\u003e4.2.1 A Definition of Risk-based PSSR. A Qualitative Approach.\u003c\/p\u003e \u003cp\u003e4.2.2 An Example Algorithm.\u003c\/p\u003e \u003cp\u003e4.3 Typical Considerations for all Pre-startup Safety Reviews.\u003c\/p\u003e \u003cp\u003e4.3.1 Hardware and Software: Equipment, Instrumentation, and Process Control.\u003c\/p\u003e \u003cp\u003e4.3.2 Documentation: Process Safety Information, Procedures, and Maintenance Management System Data.\u003c\/p\u003e \u003cp\u003e4.3.3 Training: Quality and Verification of Completeness.\u003c\/p\u003e \u003cp\u003e4.3.4 Special Items: Specific Safety, Health, and Environmental Issues.\u003c\/p\u003e \u003cp\u003e4.4 An Example Risk-based Questionnaire.\u003c\/p\u003e \u003cp\u003e4.5 Two Examples of Using a Risk-based Approach to PSSR Design.\u003c\/p\u003e \u003cp\u003e4.5.1 A Simple PSSR.\u003c\/p\u003e \u003cp\u003e4.5.2 A More Complex PSSR.\u003c\/p\u003e \u003cp\u003e4.6 References.\u003c\/p\u003e \u003cp\u003e\u003cb\u003e5. The Pre-Startup Safety Review Work Process.\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003e5.1 Defining the PSSR System.\u003c\/p\u003e \u003cp\u003e5.1.1 Double Checking Management of Change.\u003c\/p\u003e \u003cp\u003e5.1.2 Who Is Responsible for Driving the System?\u003c\/p\u003e \u003cp\u003e5.2 PSSR Sub-elements.\u003c\/p\u003e \u003cp\u003e5.2.1 Construction and equipment meet the designed specifications.\u003c\/p\u003e \u003cp\u003e5.2.2 Safety, operating, maintenance and emergency procedures are in place and adequate.\u003c\/p\u003e \u003cp\u003e5.2.3 A PHA has been performed for new facilities.\u003c\/p\u003e \u003cp\u003e5.2.4 Training of each employee involved in the process is complete.\u003c\/p\u003e \u003cp\u003e5.2.5 General requirements.\u003c\/p\u003e \u003cp\u003e5.3 Designing and Implementing an Initial PSSR Program.\u003c\/p\u003e \u003cp\u003e5.3.1 Defining a Policy on PSSR.\u003c\/p\u003e \u003cp\u003e5.3.2 Defining the PSSR Team.\u003c\/p\u003e \u003cp\u003e5.3.3 Designing the Specific PSSR.\u003c\/p\u003e \u003cp\u003e5.3.4 Training the Workforce on the PSSR Program.\u003c\/p\u003e \u003cp\u003e5.3.5 An Example PSSR Program.\u003c\/p\u003e \u003cp\u003e5.4 Preparing to Perform a Pre-statup Safety Review.\u003c\/p\u003e \u003cp\u003e5.4.1 Gather the Documentation.\u003c\/p\u003e \u003cp\u003e5.4.2 Schedule Meetings as Needed.\u003c\/p\u003e \u003cp\u003e5.4.3 Verify the Trigger Event Related Work Is Complete.\u003c\/p\u003e \u003cp\u003e5.4.4 Identify and Track the Process Hazard Analysis Action Items.\u003c\/p\u003e \u003cp\u003e5.5 Follow Pre-startup Safety Review Action Items.\u003c\/p\u003e \u003cp\u003e5.5.1 Which Items Are Critical for Safe Operation?\u003c\/p\u003e \u003cp\u003e5.5.2 Consider Past PSSR PSM Compliance Audit Findings.\u003c\/p\u003e \u003cp\u003e5.6 Approve the Pre-startup Safety Review Report.\u003c\/p\u003e \u003cp\u003e5.6.1 Reference the Documentation: Electronic or Hardcopy.\u003c\/p\u003e \u003cp\u003e5.6.2 PSSR Team Approval.\u003c\/p\u003e \u003cp\u003e5.6.3 Management Approval.\u003c\/p\u003e \u003cp\u003e5.7 References.\u003c\/p\u003e \u003cp\u003e\u003cb\u003e6. Methodologies for Compiling and Using A PSSR Checklist.\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003e6.1 Building Your Facility’s Database of Questions.\u003c\/p\u003e \u003cp\u003e6.1.1 Beware of Shortcuts.\u003c\/p\u003e \u003cp\u003e6.1.2 Considerations for Different Industries.\u003c\/p\u003e \u003cp\u003e6.2 Various Approaches: Electronic versus Hardcopy.\u003c\/p\u003e \u003cp\u003e6.2.1 Using your Existing Facility Action Item Tracking System.\u003c\/p\u003e \u003cp\u003e6.2.2 Basic Electronic PSSR Checklist Tools.\u003c\/p\u003e \u003cp\u003e6.2.3 Electronic Change Management Systems with PSSR Tools.\u003c\/p\u003e \u003cp\u003e6.3 An Example Electronic Checklist.\u003c\/p\u003e \u003cp\u003e6.3.1 Collapse the Checklist for Simple PSSR.\u003c\/p\u003e \u003cp\u003e6.3.2 Expand the Checklist for Complex PSSR.\u003c\/p\u003e \u003cp\u003e\u003cb\u003e7. Continuous Improvement.\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003e7.1 Diagnosing PSSR System Issues.\u003c\/p\u003e \u003cp\u003e7.2 Training and Communication.\u003c\/p\u003e \u003cp\u003e7.3 Examine Excesses as well as Deficiencies.\u003c\/p\u003e \u003cp\u003e7.4 Why Refine, Improve, Upgrade, or Redesign?\u003c\/p\u003e \u003cp\u003e7.4.1 Workforce Reductions.\u003c\/p\u003e \u003cp\u003e7.4.2 Company Restructuring.\u003c\/p\u003e \u003cp\u003e7.4.3 Acquisitions, Mergers, and Divestiture.\u003c\/p\u003e \u003cp\u003e7.4.4 Regulatory Changes.\u003c\/p\u003e \u003cp\u003e7.4.5 Changes in Process Risk.\u003c\/p\u003e \u003cp\u003e7.5 Upgrading the System.\u003c\/p\u003e \u003cp\u003e7.6 Example PSSR Performance and Efficiency Metrics.\u003c\/p\u003e \u003cp\u003e7.6.1 PSSR Performance Indicators.\u003c\/p\u003e \u003cp\u003e7.6.2 PSSR Efficiency Indicators.\u003c\/p\u003e \u003cp\u003e7.7 Audit Frequency.\u003c\/p\u003e \u003cp\u003e7.8 Qualification Considerations for PSSR Auditors.\u003c\/p\u003e \u003cp\u003e7.9 Sample PSSR Audit Protocols.\u003c\/p\u003e \u003cp\u003e7.10 Addressing Audit Results.\u003c\/p\u003e \u003cp\u003e7.11 Summary.\u003c\/p\u003e \u003cp\u003e7.12 References.\u003c\/p\u003e \u003cp\u003eAppendix A. PSSR Checklist Examples.\u003c\/p\u003e \u003cp\u003eAppendix B. Industry References.\u003c\/p\u003e \u003cp\u003eAppendix C. Regulatory References.\u003c\/p\u003e \u003cp\u003eIndex.\u003c\/p\u003e\u003c\/font\u003e\u003c\/p\u003e\r\n\r\n\u003cp\u003e\u003cfont size=\"3\"\u003eSubject Areas: Industrial chemistry \u0026amp; manufacturing technologies [\u003ca title=\"See our other books on Industrial chemistry \u0026amp; manufacturing technologies\" href=\"https:\/\/freshlyprintedbooks.co.uk\/search?q=%22Industrial%20chemistry%20\u0026amp;%20manufacturing%20technologies%20%5BTD%5D%22\"\u003eTD\u003c\/a\u003e]\u003c\/font\u003e\u003c\/p\u003e\r\n\r\n\r\n\u003c\/font\u003e","brand":"Wiley-Interscience","offers":[{"title":"Brand New","offer_id":52173802504472,"sku":"9780470134030","price":100.19,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0730\/2037\/5320\/files\/9780470134030.jpg?v=1781172579","url":"https:\/\/freshlyprintedbooks.co.uk\/products\/guidelines-for-performing-effective-pre-startup-safety-reviews-hardback-9780470134030","provider":"Freshly Printed Books","version":"1.0","type":"link"}