{"product_id":"critical-path-methods-in-construction-practice-hardback-9780471620570","title":"Critical Path Methods in Construction Practice (Hardback) 9780471620570","description":"\u003cfont face=\"Georgia\"\u003e\r\n\u003cp\u003e\u003cfont size=\"6\"\u003eCritical Path Methods in Construction Practice\u003c\/font\u003e\u003cbr\u003e\r\n\r\n\r\n\r\n\r\n\r\n\u003c\/p\u003e\n\u003cp\u003e\u003cfont size=\"4\"\u003eJames M. Antill (Author), Ronald W. Woodhead (Author)\u003c\/font\u003e\u003c\/p\u003e\r\n\r\n\u003cp\u003e\u003cfont size=\"3\"\u003e9780471620570, Wiley\u003c\/font\u003e\u003c\/p\u003e\r\n\r\n\u003cp\u003e\u003cfont size=\"3\"\u003eHardback, published 21 March 1990\u003c\/font\u003e\u003c\/p\u003e\r\n\r\n\u003cp\u003e\u003cfont size=\"3\"\u003e448 pages\u003cbr\u003e24.5 x 16.3 x 2.9 cm, 0.756 kg\u003c\/font\u003e\u003c\/p\u003e\r\n\r\n\r\n\r\n\r\n\r\n\u003cp align=\"justify\"\u003e\u003cstrong\u003e\u003cfont size=\"3\"\u003eAn updated and revised edition of the standard work on the use of critical path methods (CPM) in the construction industry. Describes the mechanics and procedures of CPM in construction planning and works control and demonstrates its application to large and small projects alike. Emphasis is not on the mathematics--the stress here is on the solution of problems commonly encountered in construction practice.\u003c\/font\u003e\u003c\/strong\u003e\u003c\/p\u003e\r\n\r\n\u003cp\u003e\u003cfont size=\"3\"\u003eCritical Path Method Procedures and Terminology.\u003cbr\u003e \u003cbr\u003e The Network Diagram and Utility Data.\u003cbr\u003e \u003cbr\u003e Network Calculations I: Critical Paths and Floats.\u003cbr\u003e \u003cbr\u003e Network Calculations II: Simple Compression.\u003cbr\u003e \u003cbr\u003e Network Calculations III: Complex Compression andDecompression.\u003cbr\u003e \u003cbr\u003e Network Calculations IV: Scheduling and Resource Leveling.\u003cbr\u003e \u003cbr\u003e Practical Planning with Critical Path Methods.\u003cbr\u003e \u003cbr\u003e Project Control with Critical Path Methods.\u003cbr\u003e \u003cbr\u003e Financial Planning and Cost Control.\u003cbr\u003e \u003cbr\u003e Evaluation of Work Changes and Delays.\u003cbr\u003e \u003cbr\u003e Attitudes, Responsibilities, and Duties.\u003cbr\u003e \u003cbr\u003e Computer-Aided CPM.\u003cbr\u003e \u003cbr\u003e Selection of Technique.\u003cbr\u003e \u003cbr\u003e Integrated Project Development and Management.\u003cbr\u003e \u003cbr\u003e CPM, a Systems Concept.\u003cbr\u003e \u003cbr\u003e Appendices.\u003cbr\u003e \u003cbr\u003e Index.\u003c\/font\u003e\u003c\/p\u003e\r\n\r\n\u003cp\u003e\u003cfont size=\"3\"\u003eSubject Areas: Civil engineering, surveying \u0026amp; building [\u003ca title=\"See our other books on Civil engineering, surveying \u0026amp; building\" href=\"https:\/\/freshlyprintedbooks.co.uk\/search?q=%22Civil%20engineering,%20surveying%20\u0026amp;%20building%20%5BTN%5D%22\"\u003eTN\u003c\/a\u003e]\u003c\/font\u003e\u003c\/p\u003e\r\n\r\n\r\n\u003c\/font\u003e","brand":"Wiley-Interscience","offers":[{"title":"Brand New","offer_id":52516310843672,"sku":"9780471620570","price":159.95,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0730\/2037\/5320\/files\/9780471620570.jpg?v=1786682032","url":"https:\/\/freshlyprintedbooks.co.uk\/products\/critical-path-methods-in-construction-practice-hardback-9780471620570","provider":"Freshly Printed Books","version":"1.0","type":"link"}